Project Name: Middle East Persian Gulf Oilfield
Operation Time: 2013 ~ 2014
Operation Site: Persian Gulf Oilfield
Project Background
· Large size completion tool (7 inch downhole safety valve);
· High-production gas wells (about 150-200 million cubic meter per day)
Solution
· Set liner hanger and cement, then set top packer.
· Run large size production packer, tie back to top packer seal bore, achieved full bore completion.
Achievement
Petro-King responsible for Monobore completion design, tool provision, on-site service. Smoothly complete 12 wells, the daily production rate 160 million m3/ d.